Soren, In New England it may take upto two to three weeks b4 the milled surface is replaced. Often there are very long lengths of highway milled. Its like the entire length to be resurfaced in milled, not in segments. Another problem, the BUMP b4 and after the milled area. Three weeks ago I did a little Triumph bronco riding. THERE WAS NO BUMP SIGN, HIT IT AT 50 MPH. Hold on Nelly.