Going to get these on the bike this week (God willing) but thought I would post a couple pictures along the way. Having installed the 2-1 pipe in Dec, I've been working out the best way to relocate the controls and came up with a couple mounting plates as close to the frame as possible which will have 'busa controls mounted.

The original pattern for the mounting plates was more intricate, but the setup costs for the water-jet & mill were too costly. I ended up creating most of the CAD drawing myself in order to reduce costs, so this simplified design made it a little easier on me as well.

As a reference, the pegs sit about 4.5" below the swing arm bolt & the new shift lever clears the gear shaft assembly/lever by about 1/2". The toe of the new lever is slightly in front of the gear shaft.

I'll put up more pictures when I mount them.





This is a rough mock up while checking fitment. The sprocket cover will cover a portion after some "trimming"


Last edited by dardoonk; 03/25/2013 1:06 AM.